top of page

Red Thread II Fiberglass Pipeline

  • Runs through the heart of production in Desoto Parish, LA connecting six active saltwater disposal wells in Joaquin, TX.

  • 75K barrels of volume per day

Site Safety and Security: 

  • Camera

  • SCADA monitoring.

Hours of Operation: 

24 X 7 clock pipeline booster station remote control

Roving Saltwater Disposal Operator

Physical Address:

Joaquin, TX

Texas Railroad Commission Operator #370648

Pipeline
bottom of page